Abstrak - PT. Plaza Indonesia Realty Tbk merupakan perusahaan real estate di pusat kota Jakarta.
PLN sebagai suplai utama listrik gedung Plaza Indonesia, dengan kontrak daya listrik 13 MVA
tegangan 20kV. Pengaturan load sharing setiap pengoperasian genset gas engine awal start diatur
memikul beban 800-1000 kW setiap genset disesuaikan pada kebutuhan beban kelistrikan gedung.
Pada saat kondisi peak load empat unit genset gas engine diseting memikul beban beban maksimal
1800 kW untuk setiap genset dengan suplai atau impor PLN dibatasi 100 kW. Untuk nilai drop
tegangan pada saluran digunakan batas atas 5 % dan batas bawahnya -5 %, pada saat pengukuran
lapangan berlangsung presentase drop tegangan didapati sebesar 0.001 %.
Hasil analisa total daya yang hilang sebesar 117,8 kW dan 526,8 kVar pada saat peak load
atau WBP pengoperasian genset gas engine sebagai suplai energi listrik. Sedangkan apabila
menggunakan sumber PLN sebagai pasokannya total daya yang hilang sebesar 76,3 kW dan 271,1
kvar. Hal ini dikarenakan kualitas suplai PLN sudah baik sedangkan dari suplai genset gas engine
banyak mengalami drop tegangan pada saat penyaluran energi listrik yang disebabkan oleh
spesifikasi komponen listrik baik penghantar, settingan transformator maupun jenis beban yang
terpasang

Keyword- Gas Engine Generator Set, Load Sharing, beban puncak

Abstract - PT. Abstract - PT. Plaza Indonesia Realty Tbk is a real estate company in downtown
Jakarta. PLN as the main supply of electricity for the Plaza Indonesia building, with a power
contract of 13 MVA with a voltage of 20kV. Load sharing settings for every operation of the initial
engine gas generator set is set to carry a load of 800-1000 kW each generator is adjusted to the
electrical load requirements of the building. When peak load conditions, four gas engine generator
sets are set up to a maximum load of 1800 kW for each generator with PLN supply or import limited
to 100 kW. For the value of the voltage drop in the channel used the upper limit of 5% and the
lower limit of -5%, when the field measurement took place the percentage of voltage drop was
found to be 0.001%.
The results of the analysis of total power loss of 117.8 kW and 526.8 kVar during peak load
or WBP operation of the gas engine generator as an electrical energy supply. Whereas when using
PLN sources as its supply the total lost power is 76.3 kW and 271.1 kvar. This is because the quality
of the PLN supply is good while the supply of gas engine generators experiences a lot of voltage
drop during the distribution of electrical energy caused by electrical component specifications both
conductor, transformer settings and the type of load attached

Keyword- Gas Engine Generator Set, Load Sharing, Peak load